Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 11
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ഏപ്രില് 07
Multiple Choice Question in current-affairs-2016-12-22
Multiple Choice Question in current-affairs-2017-01-22
Multiple Choice Question in biochemistry-structure-and-properties-of-peptides
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ക്വിസ് | ഡിസംബര് 05 - 12
Multiple Choice Question in biochemical-engineering-fluid-flow
Multiple Choice Question in biochemistry-allosteric-effects
Multiple Choice Question in current-affairs-2017-05-07
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 26
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering building construction
1. The process of keeping concrete moist for a certain period after its finishing, is known as
(A): compaction of concrete
(B): curing of concrete
(C): finishing of concrete
(D): none of these.
(E): placing of concrete
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->Assume that 20 cows and 40 goats can be kept for 10 days for Rs. If the cost of keeping 5 goats is the same as the cost of keeping 1 cow, what will be the cost for keeping 50 cows and 30 goats for 12 days?....
QA->The process in which a liquid changes into its vapour from its surface at a temperature below its boiling point is called?....
QA->The process of adding certain impurities in the crystal structure of a semiconductor so as to improve its conductivity is called?....
QA->____ gives the author of an original work exclusive right for a certain time period in relation to that work, including its publication, distribution and adaptation:....
QA->Which country removed India from its currency monitoring list of major trading partners after certain developments and steps were taken by India to avert concerns surrounding foreign exchange irregularities?....
MCQ->The process of keeping concrete moist for a certain period after its finishing, is known as....
MCQ->The process of hardening the concrete mixes by keeping its surface moist for a certain period is called:....
MCQ->The process of hardening the concrete by keeping its surface moist is known....
MCQ->The following steps are necessary to obtain sufficient accuracy with the tape : 1. Keeping uniform tension on tape for each measurement: 2. "Breaking" tape on slopes are necessary to keep the tape level. 3. Keeping accurate count of the stations. 4. Keeping the tape on the line being measured. The correct sequence of these steps is....
MCQ->Consider the following statements in regard to aerobic and anaerobic treatment processes : 1. Biomass production in the aerobic treatment process is more as compared to the anaerobic treatment process. 2. Start-up period is more in the aerobic treatment process as compared to the anaerobic treatment process. 3. Energy consumption and production is more in the aerobic treatment process as compared to the anaerobic treatment process. Which of the statements given above is/are correct ?....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution