1. A pre-stressed concrete pile is






Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->By whom were the triratnas were stressed?....
QA->To make a pile....
QA->Which mountain pass of the Himalayas has the literal meaning of ‘Pile of Corpses’ due to people dying in bad weather trying to cross the pass ?....
QA->The term ‘Chicago Pile’ refers to....
QA->Who were the inventors of concrete and the technique of binding stone and bricks?....
MCQ->Consider the following statements pertaining to a pile group and a single pile at failure : 1. In loose and medium dense sands, the failure load per pile in a group will generally be greater than the failure load for a single pile. 2. In cohesive soils, the failure load per pile in a group will be greater than failure load for a single pile. 3. For piles driven in dense sands, the failure load per pile in a group is greater than the failure load for a single pile. 4. When the pile spacing is greater than 10 times the pile diameter, the failure loads per pile in a group and forly same in both sands and clays. Of these statements :....
MCQ->Consider the following field tests : 1. Vertical pile load test 2. Cyclic pile load test 3. Lateral pile load test 4. Instrumented test pile While estimating the load carrying capacity of a pile, the tests that can be used for separating the skin resistance from point resistance, would include....
MCQ->Two piles, one a bored cast-in-situ pile and another a precast driven pile, both of same length and diameter are constructed in a loose sand deposit. If the bearing capacity of the bored pile is Q1, and that of the precast driven pile is Q2, then which of the following is correct ?....
MCQ->In a pre-stressed concrete beam of span 6 m and section 300 mm x 500 mm,the pre-stressing tendons are located along the longitudinal centroidal axis,with an effective pres-stressing force of 900kN.If the beam is subjected to a uniformly distributed load of 15 kN/m including the self weight of the beam,the top and bottom extreme fibre stresses in concrete at the mid span section are respectively....
MCQ->A pre-stressed concrete pile is....