1. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->Name the irrigation project which has entered into the Guiness Book of World Records for pouring 32,100 cubic meters of concrete in 24 hours?....
QA->The quantity of heat required to raise the temperature of unit mass of a substance by 1°C is called its?....
QA->Which are the important raw materials required in cement industry?....
QA->Which are the important raw materials required in cement industry ?....
QA->Which is/are the important raw material(s) required in cement industry?....
MCQ->A five storey building (consisting of a ground floor and four floors on top of it such that the ground floor is numbered 1, the floor above it, numbered 2and so on till the topmost floor above it, numbered 2 and so on till the topmost floor is numbered 5) houses different people viz. H,I,J,K and L. Who lives on the lowermost floor (i.e. floor numbered 1) ? J lives on floor numbered 3. K lives immediately below L. K lives on an even numbered floor. Only two people live between L and H. L lives above H. J lives immediately before K. J lives on an odd numbered floor.....
MCQ->A six-storey building consisting of an unoccupied ground floor and five floors on top of the ground floor numbered 1,2, 3,4 and 5 houses five different persons, viz A, B, C, D and E. Who lives on the third floor?I. C lives on an even-numbered floor. A lives immediately above D. B lives immediately above A.II D lives on an odd-numbered floor. A and B are immediate neighbours. Similarly, C and E are immediate neighbours. C does not live on an odd -numbered floor.....
MCQ->For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is....
MCQ->For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is....
MCQ->A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions