Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 11
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ഏപ്രില് 07
Multiple Choice Question in current-affairs-2016-12-22
Multiple Choice Question in current-affairs-2017-01-22
Multiple Choice Question in biochemistry-structure-and-properties-of-peptides
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ക്വിസ് | ഡിസംബര് 05 - 12
Multiple Choice Question in biochemical-engineering-fluid-flow
Multiple Choice Question in biochemistry-allosteric-effects
Multiple Choice Question in current-affairs-2017-05-07
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 26
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering waste water engineering
1. A manhole is generally provided at each
(A): all the above.
(B): bend
(C): change of gradient
(D): change of sewer diameter
(E): junction
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->There are 50 students in a class. In a class test 22 students get 25 marks each, 18 students get 30 marks each. Each of the remaining gets 16 marks. The average mark of the whole class is :....
QA->Two speed reverse gear arrangement is generally provided in:....
QA->Name the economy in which people work according to the principle ‘from each according to his ability to each according to his needs’?....
QA->Name the set of proofs where each of the process colors is printed separately and in combination with each colors....
QA->Which of these methods involves passing paper through a press twice but using one same plate each time to print two complete signatures on each sheet ?....
MCQ->A sewer is laid from a manhole A to a manhole B, 250 m away along a gradient of 1 in 125. If the reduced level of the invert at A is 205.75 m and the height of the boning rod is 3 m, the reduced level of the sight rail at B, is....
MCQ->A sewer is laid from a manhole A to a manhole B, 250 m apart along a downward gradient of 1 in 250. If the reduced level of the invert at A is 205.75 m and the height of the boring rod is 3 m, then, reduced level of the sight rail at B, is....
MCQ->A manhole is generally provided at each....
MCQ->The inspection pit or chamber is a manhole provided in a base drainage system....
MCQ->A drop manhole is provided if....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution