Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
History
Popular Pages
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 11
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ഏപ്രില് 07
Multiple Choice Question in current-affairs-2016-12-22
Multiple Choice Question in current-affairs-2017-01-22
Multiple Choice Question in biochemistry-structure-and-properties-of-peptides
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ക്വിസ് | ഡിസംബര് 05 - 12
Multiple Choice Question in biochemical-engineering-fluid-flow
Multiple Choice Question in biochemistry-allosteric-effects
Multiple Choice Question in current-affairs-2017-05-07
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 26
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
1. ’AT-shaped’retaining wall consists of:
(A): None of the above
(B): One cantilever
(C): Three cantilevers
(D): Two Cantilevers
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
By: guest on 25 Oct 2017 08.49 am
3 is ans
Show Similar Question And Answers
QA->By which is in practice the policy of the Government shaped?....
QA->A V-shaped valley is a feature produced by which river?....
QA->Bowl shaped depression created as a result of glacial erosion high on a mountainside what is this called?....
QA->Moon shaped sand-dunes; formed by which wind action?....
QA->By which is in In practice the policy of the Government shaped?....
MCQ->All the offices on the 9th floor have wall-to-wall carpeting. No wall-to-wall carpeting is pink. None of the offices on the 9th floor has pink wall-to-wall carpeting. If the first two statements are true, the third statement is....
MCQ->’AT-shaped’retaining wall consists of:....
MCQ->If H is the overall height of a retaining wall retaining a surcharge, the width of the base slab usually provided, is....
MCQ->5 skilled workers can build a wall in 20 days; 8 semi-skilled worker can build a wall in 25days; 10 unskilled workers can build a wall in 30 days, If a team has 2 killed, 6 semi-skilled and 5 unskilled workers, how long will it take to build the wall?....
MCQ->A wall of length 4 m,height m and thickness 4 m,has the inner wall surface at 140 oC and that the outer at 20 oIf the thermal conductivity of wall material is -85 W/mK,the temperature at 10 cm from the inner wall is:....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution