Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 11
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ഏപ്രില് 07
Multiple Choice Question in current-affairs-2016-12-22
Multiple Choice Question in current-affairs-2017-01-22
Multiple Choice Question in biochemistry-structure-and-properties-of-peptides
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ക്വിസ് | ഡിസംബര് 05 - 12
Multiple Choice Question in biochemical-engineering-fluid-flow
Multiple Choice Question in biochemistry-allosteric-effects
Multiple Choice Question in current-affairs-2017-05-07
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 26
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
mechanical engineering machine design
1. When compared to the rod of the same diameter and material, a wire rope
(A): does not provide much warning before failure
(B): has a much smaller load carrying capacity
(C): is less flexible
(D): provides much greater time for remedial action before failure
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->A steel wire when bent in the form of a square encloses an area of 121 sq. cm. If the same wire is bent into the form of a circle, the area of the circle is—....
QA->A, B and C start at the same time in the same direction to run around a circular stadium. A completes a round in 252 seconds, B in 308 seconds and c in 198 seconds, all starting at the same point. After what time will they again at the starting point ?....
QA->A coil of insulated wire bound on a rod shaped form made of solid iron is called?....
QA->A magnet made by binding insulated copper wire over a soft iron piece and passing an electric current through the wire is called?....
QA->P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in --- days.....
MCQ->A basket and its contents weigh 10 lb. A 20-lb monkey grabs the other end of the rope and very quickly (almost instantaneously) accelerates by pulling hard on the rope until he is moving with a constant speed of vm/r = 2 ft/s measured relative to the rope. The monkey then continues climbing at this constant rate relative to the rope for 3 seconds. How fast is the basket rising at the end of the 3 seconds? Neglect the mass of the pulley and the rope.....
MCQ->A wire has a resistance R ohm. If another wire of the same material and same weight has double the diameter (as compared to the first wire), the resistance of the second wire will be....
MCQ->When compared to the rod of the same diameter and material, a wire rope....
MCQ->What is the maximum weight that can be lowered by a person who can exert a 500 N pull a rope if the rope is wrapped 2 ½ turns around a horizontal spur? Coefficient of friction between spur and rope is 3:....
MCQ->A 600 mm long and 50 mm diameter rod of steel (E = 200 GPa, α = 12 x 10-6/°C) is attached at the ends to unyielding supports. When the temperature is 30°C there is no stress in the rod. After the temperature of the rod drops to - 20°C, the axial stress in the rod will be....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution